Volume tiers, shelf life and reorder points: a purchasing framework for a plant that runs MP2100 continuously.
Tile adhesive plants consume binder steadily, which makes MP2100 an inventory decision as much as a purchasing one.
Suppliers price in tiers, and the step between a pallet, a part container and a full container is usually worth more than a negotiated discount.
Calculate which tier your annual volume reaches when orders are consolidated. Two full containers a year can be cheaper than twenty-four pallet orders, even after storage costs.
Six months is the working shelf life in dry storage below 25 °C. A safety stock larger than that is not a safety stock, it is slow-moving inventory.
Size the buffer to the longest production run plus the transit time, and check the production date on arrival rather than the delivery date.
Set the reorder point from consumption per week and lead time in weeks, plus a margin for the seasonal peak. Most stock-outs happen because the reorder point was set from average consumption rather than peak consumption.
Review the point twice a year. A change in product mix moves consumption without any announcement.
The grade this note is about, and two that sit next to it in the range.
Send the mortar system, the grade you are considering and the volume you plan for. The reply comes back with a dosage recommendation and a quotation.
Fred Wang
Sales
Scan to reach Fred Wang on WhatsApp
Scan to WhatsApp